UN REVE FRANCAIS | LES PROJETS GOUVERNEMENTAUX | OCTOBRE 1972 ACCORD GOUVERNEMENTAL | SEPTEMBRE 1981 ETUDE DE FAISABILITE | 1981 ETUDE DE FAISABILITE | 11 AOUT 1982 GROUPE DES CINQ BANQUES | 10 JUIN 1983 LE SOUTIEN EUROPEEN | 5 MARS 1984 CONSTITUTION DU CHANNEL TUNNEL GROUP | AVRIL 1984 APPEL A SOUMISSION DE PROJETS | MAI 1984 RAPPORT DES CINQ BANQUES | 30 NOVEMBRE 1984 SOMMET FRANCO-BRITANNIQUE | FEVRIER 1985 NAISSANCE DE FRANCE MANCHE | 2 AVRIL 1985 APPEL D'OFFRES LIEN TRANSMANCHE | 30 SEPTEMBRE 1985 ANNONCE  DU COUT DE CONSTRUCTION | 18 OCTOBRE 1985 FORMATION DE TRANSMANCHE LINK | 31 OCTOBRE 1985 REMISE DES OFFRES | 18 DECEMBRE 1985 EUROTUNNEL SA | 20 JANVIER 1986 CHOIX DU CONCESSIONNAIRE


 
--

 

Le tunnel sous la Manche fait 50,5 km de long et relie Coquelles, près de Calais, à Cheriton, près de Folkestone dans le Kent. Le tunnel sous marin a une longueur de 39 km de long.

Les trains circulent dans deux tunnels de 7,6 m de large, de part et d'autre d'une galerie de 4,8 m de large.

Les navettes ferroviaires ont une vitesse de 130km/h sous la mer. Elles font 800 m de long et peuvent transporter jusqu'à 180 voitures, ou 120 voitures et 12 bus. Les navettes de fret peuvent transporter 28 camions.

Les trains Eurostar franchissent le tunnel à 140 km/h.

Le tunnel a une capacité maximale de 600 trains par jour dans les deux sens.

 

 